First, we put the plywood up for the walls. This was pretty hard, as Tim had to measure and get stuff in the right place and I had to hold it up. It did not work so well! But thanks to a beautiful rig of 2 x 4's and a car jack, we got these suckers up on the vertical surfaces. Next, we got the ceiling of floor one/floor of floor two up. Again, with very little variance over the 16 x 24' area. Way to go, Tim! He framed up the door openings while I sealed cracks with expanding foam sealant. Lastly, we put tar paper up as the first step in the stucco process later on. It is a total bitch! Now we know why people put this stuff up on roofs, and not walls! Our fingers were sore and bruised for days after we did our big push over a weekend for this miserable part of the project. Glad to see the end of it....